Set a company-wide vacation to skip Check-ins (Admin)

Account Admins can set a vacation that skips Check-ins for everyone in the organization at once. When the vacation is saved, any Check-in period that overlaps with the vacation dates — even by one day — is skipped for all users.

Before You Begin

You must have Account Admin access to complete these steps.

Steps

  1. Click the Settings gear in the bottom-left corner of your 15Five account.
  2. Select Company settings from the dropdown menu.
  3. Click Vacations in the top navigation bar.
  4. Enter the start and end dates for the company vacation.
  5. Add a note in the notes field (optional).
  6. Click Add vacation.

If Something Goes Wrong

Issue Check Fix
Vacations tab is not visible in Company settings Confirm your account role is Account Admin Contact your 15Five administrator to verify your role
A Check-in was not skipped during the vacation period Verify the vacation dates overlap with the Check-in period by at least one day Edit the vacation to extend the start or end date to cover the Check-in period
A Check-in was skipped but should not have been Confirm the Check-in period falls entirely outside the vacation dates Open the skipped Check-in and click Undo skip settings on the vacation placeholder screen

Not Covered Here

This article covers company-wide vacations only — for setting vacations for individual employees or direct reports, see the related articles below.